Country & Language

Lean Labs Project Boosts Pharmaceutical Lab Productivity by 33%

A pharmaceutical manufacturer needed to improve the productivity of its laboratories. The implementation of a Lean Lab project boosted productivity by 33% across the pharmaceutical product portfolio.

Life Sciences
Lean Lab
Manufacturing
Parallaxe

Our Client

A Swiss multinational company specializing in the life sciences sector, providing products and services for the pharmaceutical, biotechnology, and specialty ingredients markets. It is known for its expertise in biologics development, cell and gene therapy manufacturing, and chemical manufacturing solutions. The company has a €15 billion turnover with approximately 15,500 full-time employees based in more than 100 sites and offices worldwide.

€15B

Turnover

+15K

Full-time employees

+100

Sites and offices worldwide

Parallaxe

The Challenge

The client asked EFESO to implement their Lean Lab approach due to key challenges that included:

  • Production volumes are set to increase across the pharmaceutical product portfolio.
  • Improve the productivity of the laboratories so that increase capacity without increasing headcount
  • Implement Lean Lab approach within one of the sites in France

Real Results Achieved Together

Thanks to the solutions provided, the results were positive enough to acommdate production increase based on forecast for the following two years.

+33%

Productivity improvement

+19%

Improvement in Quality Control

+5%

Improvement in Analytical Development

Transformation Impact

  • Productivity Improvement including 2-year production increase of 33% across pharmaceutical product portfolio
  • Supported by Visual Management daily workload management through the use of White Boards
  • KPIs were determined and collection systems defined to foster ownership of lab processes, monitor the new systems of operation and encourage continuous improvement
  • A capacity management planning tool was delivered
Parallaxe

Our Approach

EFESO implemented their Lean Lab approach by developing appropriate leveling strategies for incoming workload:

  • Using Heijunka devices such as rhythm wheels and trains
  • Defining project workloads (with triaging) and milestones
  • Standardizing work to define roles and achieve workload balancing
  • Identify wasteful practices and eliminate where appropriate

EFESO also provided solutions that would accommodate production increase based on forecast for the following 2 years and developed appropriate visual management tools to support the new system of operation.

Related Services

Volatile workloads create productivity troughs and lead-time peaks. We stabilize lab operations through capacity modeling, dynamic resource allocation, and lean process optimization.
Aging equipment meets rising costs and technology disruption. We transform operations through smart factory integration, predictive maintenance, and workforce capability building.
Parallaxe

Ready to Unlock Hidden Capacity in Your Labs?

  • Increase productivity without adding headcount or expanding facilities
  • Stop letting inefficient workflows and unbalanced workloads limit your lab’s potential
  • See how leading pharmaceutical manufacturers are achieving double-digit productivity gains with Lean Lab methodology
Contact our experts

Discover More Clients Results

45K m²
Optimized factory layout (reduced from 52K m²)
Industrial Manufacturing

Creating a solid, structured plan for the material flow of its production and validated the static forecast, enabling the factory to increase the output with the existing machinery.

13%
Reduction in release time for high-value APIs
Chemicals
Life Sciences

A QC lab optimization framework helps a multinational chemical-pharmaceutical company achieved simultaneous gains in productivity, service level, and resource efficiency, delivering measurable improvements in release time, productivity, and FTE requirements without compromising quality.