Skip to content

Turning an Energy Crisis into a €350 Million Opportunity

Industry: Chemicals

Service: Operations Strategy and Transformation

Service: Sustainability

Parallaxe

Our Client

A diversified chemicals group operating globally with both specialty chemicals and commodity products portfolios. The company maintains a strong culture of operational excellence developed through long-standing continuous improvement initiatives. Its European operations represent critical production capacity for both regional and global markets, with heavy energy consumption integral to its manufacturing processes.

+100

Production sites worldwide

40%

Operations in Europe

+1K

Employees at largest site

2km²

Site coverage area

Parallaxe

The Challenge

The war in Ukraine created an unprecedented energy crisis that threatened the viability of European chemical manufacturing operations.

  • Fivefold cost increase: Energy prices in Europe rose dramatically due to the disruption of Russian gas supplies, creating immediate pressure on heavy energy-consuming production units
  • Existential threat to European operations: The sudden cost surge posed the risk of potential shutdown for business units across multiple European countries, threatening both regional supply chains and global production capacity
  • Complex energy infrastructure: The interconnected nature of production units with centralized energy departments required comprehensive analysis across multiple sites, to identify savings opportunities while maintaining operational continuity


Real Results Achieved Together

Comprehensive energy diagnostics transformed an immediate crisis into a structured improvement program across European operations. Working alongside site teams and engineering departments, the partnership delivered immediate relief through quick wins and long-term sustainability through major energy projects.

350 M

Total savings identified

160

Energy-saving ideas generated

15%

CO2 emissions reduction

30

Quick win initiatives

Transformation Impact

Parallaxe

Our Approach

The partnership combined EFESO’s operational excellence expertise with DB Energy’s specialized energy engineering capabilities, working closely with the in-house team.

The three-step approach began with energy walkthroughs, spending one to two days on-site analyzing energy balance and discussing findings with operators and engineers. S

elected opportunities moved to concept design phase, developing detailed feasibility studies and business cases. The engineering and construction phase followed, with projects implemented either by the client’s in-house engineering team or subcontracted to DB Energy.

Initial diagnostics at four production plants and the main energy department expanded to ten additional plants across different European countries.

The vendor-neutral engineering expertise from DB Energy enabled unbiased assessment of energy-saving opportunities, from small operational improvements to large capital expenditure projects.

Quick wins, including adjusting pump pressure levels and improving steam pipe insulation, delivered immediate savings to recover project costs rapidly.

Related Services

Operations Strategy and Transformation

Helping organizations rethink how they create value. We strengthen performance, build resilience, and accelerate growth across every layer of your business.

Sustainability

ESG pledges require embedded operational transformation. We deliver measurable impact through circular economy practices, carbon reduction programs, and sustainable value chain redesign.

Parallaxe

Facing Similar Energy and Cost Challenges?

  • Rising energy costs threatening your operational margins and production viability
  • Transforming energy constraints into competitive advantage through systematic improvement
  • Partner with us to identify and implement sustainable cost reduction opportunities


Contact our experts

Discover More Clients Results

-45%

Reduction in maintenance backlog

Transportation, Logistics and Services

Transforming Public Transit Operations at Scale

Metropolitan transit authority needed reliability improvement and cost optimization. We enhanced maintenance programs, optimized scheduling, and improved asset utilization, achieving 98% service availability.