59%
Reduction in FTE to meet demand requirements
Industry: Transportation, Logistics and Services
Service: Operations Strategy and Transformation
Service: People and Organization
A large metropolitan rail operator’s heavy maintenance facility in Chicago sought approval to increase staffing to support a new weekly target of 30 passenger car inspections, up from a historical average of 23.
Leadership requested an independent assessment to determine the minimum staffing required and to identify operational improvement opportunities. Key challenges included:
EFESO optimized rail maintenance staffing through productivity analysis, reducing workforce by 59% while meeting increased inspection targets.
59%
Reduction in FTE to meet demand requirements
EFESO conducted a detailed productivity analysis to determine optimal staffing levels:
Standard Hour Benchmarking
Craft-Level Workload Modeling
On-site Process Observations
Adjustment for Unscheduled Work
Staffing Optimization