Skip to content

Bottleneck Cycle Time Reduction Boosts Productivity by 30%

A leading global manufacturer of automotive components partnered with EFESO to address a production bottleneck within its new electric vehicle battery cooling systems line. Through a data-driven, cross-functional approach, EFESO helped the client reduce cycle time, boost productivity by 30%, and set the foundation for a potential 60% volume increase with minor product design modifications.

Service: Operational Excellence

Parallaxe

Our Client

The client is a multinational manufacturer of automotive components, recognized for its technical expertise and strong industrial footprint. The company recently expanded its portfolio with a new business line dedicated to electric vehicle battery cooling systems, rapidly gaining significant market share in this emerging segment.

We can postpone investments for 2 years coping with the demand in the meanwhile.

Chief Executive Officer
Parallaxe

The Challenge

The client’s new product line for the electric vehicle market faced a severe production bottleneck at the press stage.
Despite numerous attempts to improve performance, the issue persisted due to:

  • Process not in basic conditions: Established “habits” were treated as fixed rules, resulting in unnecessary steps and extended cycle time.
  • Incomplete understanding of failure modes: Root causes were only partially identified, preventing sustainable improvements.
  • Limited link between product and process design: Potential design adjustments that could enable higher productivity were not explored.

Real Results Achieved Together

The collaboration delivered measurable performance gains and created a solid foundation for further scalability.

+30%

Productivity increase through cycle time reduction

+60%

Potential volume increase pending customer approval of minor product design modifications

Transformation Impact

  • Eliminated inefficiencies and optimized bottleneck performance.
  • Strengthened cross-functional collaboration between R&D, Quality, Maintenance, and Production.
  • Established experimental methodologies that generated new process knowledge.
  • Built readiness for substantial volume growth with minimal design changes.
Parallaxe

Our Approach

EFESO’s approach combined rigorous technical analysis with strong cross-functional collaboration:

  1. Correlating Product and Process
    • Linked product design characteristics to process performance.
    • Identified unnecessary phases that increased cycle time.
  2. Restoring Basic Process Conditions
    • Conducted in-depth analysis of process parameters and variability.
    • Re-established process standards and eliminated inefficiencies.
  3. Cross-Functional Problem Solving
    • Facilitated hands-on collaboration between R&D, Quality, Maintenance, and Production teams.
    • Designed and executed targeted experiments to generate factual knowledge and validate improvement hypotheses.
Parallaxe

Ready to Unlock Hidden Capacity in Your Production Line?

  • Eliminate bottlenecks and boost productivity without major capital investment
  • Stop accepting “that’s how we’ve always done it” as the reason for underperformance
  • Join manufacturers who’ve transformed constraints into competitive advantages
Contact our experts

Discover More Clients Results

13%

Reduction in release time for high-value APIs

Chemicals

Life Sciences

Boosting QC Lab Productivity and Service Levels Through EFESO’s Proprietary Approach

A QC lab optimization framework helps a multinational chemical-pharmaceutical company achieved simultaneous gains in productivity, service level, and resource efficiency, delivering measurable improvements in release time, productivity, and FTE requirements without compromising quality.