Client situation & approach
Our client is a world-leading packaging manufacturer with production plants globally that needs to reduce claims, waste, and productivity losses and converting costs. To achieve the set goals an extensive WCOM™ program was rolled out to all 24 plants worldwide as well as corporate skill development training. The close collaboration proceeded during a period of eight years.
Results
- Claims reduced by 50 %
- Waste reduced by 50 %
- Productivity increased by 30 %
- Converting costs reduced by 37 %
- Several TPM-awards achieved on all levels