$15M
reduction in annual fixed costs
Industry: Chemicals
Service: Manufacturing
Service: Operational Excellence
Service: Operations Due Diligence
Service: Operations Strategy and Transformation
“The introduction of dedicated work coordination and standardized maintenance processes significantly improved schedule compliance, increasing performance from approximately 60% to consistently above 80%.
“
The organization faced several challenges:
EFESO conducted rapid site diagnostics followed by a detailed operational assessment focused on maintenance effectiveness, workforce productivity, and organizational design.
$15M
reduction in annual fixed costs
30%
improvement in maintenance compliance
15%
increase in wrench time and frontline productivity
10%
reduction in fixed-cost base