Cycle time reduction of bottleneck machine led to 30% productivity increase and set the foundation for 60% volume increase with minor product modifications

Our client is a multinational company in Automotive components, with a new business line for EV batteries cooling systems, taking a relevant market share.

Key Challenges

  • Product line for EV market had a bottleneck in the press
  • Long history of tentative improvement did not succeed due to lack of scientific

Approach

  • The key to success was the ability to correlate product and process
    • Process was not in basic conditions and “habits” were considered as rules, leading to useless phases and high cycle time
    • Failure modes were not understood in depth and were partially
    • Product design can allow higher productivity once it
  • Hands-on approach and dialogue between R&D, Quality, Maintenance and Production led to knowledge generation through proper design of experiments

Results

  • 30% product line productivity increase through cycle time reduction
  • 60% potential increase subject to customer approval of new product design (small changes) already tested
We can postpone investments for 2 years coping with the demand in the meanwhile

CEO